Yesil Cevre Waste Water Treatment Plant, Sewerage Pipeline and Pumping Station

Slide Slide
PARAMETERS INLET
Average Flow 52.500 m3/day
Max Flow 4.292 m3/h
Design Flow 2.188 m3/h
BOD 12.600 kg/day
COD 40.900 kg/day
TOTAL N 2.250 kg/day
TOTAL P 300 kg/day
TSS 13.300 kg/day

Process Units:

Inlet Structure, Coarse & Fine Screens, Grit Removal, Homogenization Basin, Primary Sedimentation Basin, Aeration Tank, Secondary Sedimentation Basin, Return Sludge Pumping Station, Sludge Thickening, Sludge Dewatering, Administrative Building, Warehouse-Garage, Transformer Station, Wastewater Pipeline, Wastewater Pumping Station
Type Of Contract Design Build Contract with 4 year operation
Position Hold Project Coordinator

Sectors / Projects

project-gorsel

INFRASTRUCTURE PROJECTS

transportation-projects

TRANSPORTATION PROJECTS

above-structure-sustainablee

ABOVE STRUCTURE & SUSTAINABLE PROJECTS

energyy-projects

ENERGY PROJECTS

© 2025 AKIN CONSULTANCY & ENGINEERING (UK) LTD.
Web Design : GLOBALNET