Odemis Waste Water Treatment Plant

Slide Slide
PARAMETERS STAGE 1 STAGE 2
AVERAGE FLOW 15.765 m3/day 20.988 m3/day
MAX FLOW 1.637 m3/h 1.820 m3/h
DESIGN FLOW 1.018 m3/h 1.354 m3/h
INLET OUTLET
BOD 5.013 kg/day 25 mg/lt
COD 11.019 kg/day 90 mg/lt
TOTAL N 981 kg/day 10 mg/lt
TOTAL P 185 kg/day 1 mg/lt
TSS 6.723 kg/day 25 mg/lt

Process Units:

Collector, Coarse Screens, Fine Screens, Aerated Grit and Grease Removal, Inlet Pumping Station, Blower Station, Return and Excess Sludge Pumping Station, Sludge Dewatering Facilities, Anaerobic Tank, Aeration Tank, Secondary Clarifier
Type Of Contract Design Build Contract with 1 year operation supervision
Position Hold Project Coordinator

Sectors / Projects

project-gorsel

INFRASTRUCTURE PROJECTS

transportation-projects

TRANSPORTATION PROJECTS

above-structure-sustainablee

ABOVE STRUCTURE & SUSTAINABLE PROJECTS

energyy-projects

ENERGY PROJECTS

© 2025 AKIN CONSULTANCY & ENGINEERING (UK) LTD.
Web Design : GLOBALNET