akin-logo-yeniakin-logo-yeniakin-logo-yeniakin-logo-yeni
  • HOME
  • WHO WE ARE
  • WHAT WE DO
  • SECTORS / PROJECTS
  • MEDIA
    • News
    • Photo Gallery
    • Video Gallery
    • Online Catalog
  • CONTACT US
✕

Odemis Potable Water Treatment Plant

Slide Slide
PARAMETERS STAGE 1 STAGE 2
Average Flow 18.612 m3/day 24.581 m3/day
Max Flow 22.400 m3/day 29.497 m3/day
Population Served 95.598 people 126.207 people

Process Units:

Balancing Chamber, Cascade Aeration, Rapid Mixing & Flocculation, Clarifiers, Filters, Chlorine Contact Tank, Treated Water Tank, Plant By Pass, Chemical Building, Chlorine Building, Sludge Dewatering Facilities
Type Of Contract Design Build Contract with 1 year operation supervision
Position Hold Project Coordinator

Sectors / Projects

project-gorsel

INFRASTRUCTURE PROJECTS

transportation-projects

TRANSPORTATION PROJECTS

above-structure-sustainablee

ABOVE STRUCTURE & SUSTAINABLE PROJECTS

energyy-projects

ENERGY PROJECTS

© 2025 AKIN CONSULTANCY & ENGINEERING (UK) LTD.
Web Design : GLOBALNET