akin-logo-yeniakin-logo-yeniakin-logo-yeniakin-logo-yeni
  • HOME
  • WHO WE ARE
  • WHAT WE DO
  • SECTORS / PROJECTS
  • MEDIA
    • News
    • Photo Gallery
    • Video Gallery
    • Online Catalog
  • CONTACT US
✕

Mersin Potable Water Treatment Plant

Slide Slide
PARAMETERS INLET
Average Flow 390.000 m3/day (3 Stage – 130.000 m3/day each stage)

Process Units:

Raw Water Pumping Station, Cascade Aeration, Flash Mixing, Sedimentation Unit (Cyclofloc), Micro Sand Recirculation, Rapid Sand Filtration, Contact Tank, Treated Water Tank, Backwash Water Recovery, Thickener, Filter Press, Reagent Building, Chlorine Building, Transformer Station,
Type Of Contract Design Build Contract with 1 year operation supervision
Position Hold Project Manager

Sectors / Projects

project-gorsel

INFRASTRUCTURE PROJECTS

transportation-projects

TRANSPORTATION PROJECTS

above-structure-sustainablee

ABOVE STRUCTURE & SUSTAINABLE PROJECTS

energyy-projects

ENERGY PROJECTS

© 2025 AKIN CONSULTANCY & ENGINEERING (UK) LTD.
Web Design : GLOBALNET