Gebze Waste Water Treatment Plant

Slide
PARAMETERS INLET OUTLET
BOD 30.000 kg/day 25 mg/lt
TOTAL N 6.000 kg/day 10 mg/lt
TOTAL P 1.200 kg/day 1 mg/lt
TSS 36.000 kg/day 35 mg/lt

Process Units:

Coarse Screens, Inlet Pumping Station, Fine Screens, Aerated Grit and Grease Removal Tanks, Blower Station, Anaerobic Basin, Aeration Basin, Final Sedimentation Tanks, Return Sludge Pumping Station, Primary Sedimentation Tanks, Sea Discharge Pumping Station, Blower Station, Transformer and Generator Station, Sludge Dewatering Facility, Administrative Building
Type Of Contract Design Build Contract with 1 year operation supervision
Position Hold Project Coordinator
Average Flow 120.000 m3/day
Max. Flow 6.000 m3/h
Min Flow 3.350 m3/h

Sectors / Projects

project-gorsel

INFRASTRUCTURE PROJECTS

transportation-projects

TRANSPORTATION PROJECTS

above-structure-sustainablee

ABOVE STRUCTURE & SUSTAINABLE PROJECTS

energyy-projects

ENERGY PROJECTS

© 2025 AKIN CONSULTANCY & ENGINEERING (UK) LTD.
Web Design : GLOBALNET