ODEMIS POTABLE WATER TREATMENT PLANT
Type Of Contract: Design Build Contract with 1 year
operation supervision
Position Hold: Project Coordinator
Process Units: Balancing Chamber, Cascade
Aeration, Rapid Mixing & Flocculation, Clarifiers, Filters,
Chlorine Contact Tank, Treated Water Tank, Plant By Pass,
Chemical Building, Chlorine Building, Sludge Dewatering
Facilities
PARAMETERS STAGE 1 STAGE 2
Average Flow 18.612 m3/day 24.581 m3/day
Max Flow 22.400 m3/day 29.497 m3/day
Population Served 95.598 people 126.207 people
YESIL CEVRE WASTE WATER TREATMENT PLANT,
SEWERAGE PIPELINE AND PUMPING STATION
Type Of Contract: Design Build Contract with 4 year
operation
Position Hold: Project Coordinator
Process Units: Inlet Structure, Coarse & Fine
Screens, Grit Removal, Homogenization Basin, Primary
Sedimentation Basin, Aeration Tank, Secondary
Sedimentation Basin, Return Sludge Pumping Station,
Sludge Thickening, Sludge Dewatering, Administrative
Building, Warehouse-Garage, Transformer Station,
Wastewater Pipeline, Wastewater Pumping Station
PARAMETERS INLET
Average Flow 52.500 m3/day
Max Flow 4.292 m3/h
Design Flow 2.188 m3/h
BOD 12.600 kg/day
COD 40.900 kg/day
TOTAL N 2.250 kg/day
TOTAL P 300 kg/day
TSS 13.300 kg/day